Full infrastructure replacement for a busy CAD office

We replaced an ageing office infrastructure end to end: two new Hyper-V hosts and a Dell SAN in a cluster, a WatchGuard firewall cluster, 10 Gbit networking between every device, dark fibre to the office, and 120 Dell CAD workstations plus 20 admin laptops — with Office 365 for email and Teams, and data staying on-premises.

Download PDF
2
Hyper-V hosts in a cluster
10 Gbit
networking between devices
120
Dell CAD workstations
20
laptops for admin staff
1 Gbit
internet over dark fibre

Before

  • The old servers and storage were at the end of their life, and one failure could have stopped the whole office.
  • CAD drawings are large files, and the old network made opening and saving them slow for 120 designers.
  • There was no firewall redundancy, so a single fault could cut the office off from the internet.
  • Email and collaboration tools were dated, and staff had no simple way to meet or share files.
  • Data and project processing had to stay on-premises, so a cloud-only answer was never going to fit.

After

  • Two new Hyper-V hosts and a Dell SAN run in a cluster, so a failed host no longer stops the office.
  • A WatchGuard firewall cluster protects the office with no single point of failure.
  • 10 Gbit networking between all devices, with a Dell switch at the core, keeps large CAD files moving quickly.
  • Dark fibre to the office delivers 1 Gbit internet with room to grow.
  • 120 Dell workstations run the CAD drawing work, with 20 laptops for office admin staff.
  • Office 365 provides email and Teams for the whole office.
  • Data storage and project processing stay on-premises on the new cluster, exactly as the business needed.

Replacing the heart of the office

The office's servers and storage had reached the end of their working life. With 120 designers depending on them every day, a single failure could have stopped the whole business.

We installed two new Hyper-V hosts and a Dell SAN, set up as a cluster. If one host fails, the other carries the load, and the office keeps working.

A network built for CAD

CAD drawings are big files, and opening and saving them over a slow network wastes hours every week across a team this size.

Every device is now linked by 10 Gbit networking through a Dell switch at the core. Dark fibre to the office brings 1 Gbit internet, and a WatchGuard firewall cluster keeps the office protected with no single point of failure.

New computers for every desk

120 Dell workstations were rolled out for the CAD drawing team, with 20 laptops for office admin staff.

Office 365 gives everyone modern email and Teams meetings, while data storage and project processing stay on-premises on the new cluster — the setup the business asked for.