Unicorn IT Group

Unicorn IT Group

Case studies.

Real challenges. Practical changes. Better days at work.

With Panda IT / Mining & Resources

Greenfield minesite IT setup.

Unicorn IT Group helped Panda IT set up a new mine site’s IT. Servers, email, backups, phones and connectivity linked the mine with head office, keeping the site running from 2008 to 2015 before its move to Office 365.

Moved an entire office over one weekend

Office relocation & fitout / Professional services

02

Moved an entire office over one weekend

With a hard move-out deadline, we planned, packed, cabled and commissioned a complete office over one weekend — ready for staff on Monday morning.

1
weekend to complete the move
8
Teams Rooms ready on Monday
4
secure managed printers
100%
of staff productive on the first morning
Improving internet on the Unicorn Farm

Rural connectivity / Rural & agriculture

03

Improving internet on the Unicorn Farm

A working farm’s sheds and homestead relied on one weak connection. We improved coverage and capacity so payroll, livestock software and cameras could work together.

6x
usable capacity at the sheds
99.9%
uptime with automatic backup switching
0
dropped calls reported since switch-over
A two-site private cloud for nearly 900 TB of business data

Private cloud & recovery / Professional services

04

A two-site private cloud for nearly 900 TB of business data

A client needed resilient infrastructure while retaining control of nearly 900 TB of critical data. We built Hyper-V and Synology clusters across two NEXTDC data centres, connected by dark fibre, with off-site backups.

900 TB
of client data protected across two data centres
2
NEXTDC data centres with automatic failover
4+4
Hyper-V hosts and Synology appliances per site
2 Gbps
symmetrical Vocus office internet
A legal firm’s files moved from an ageing server to Teams

Full IT modernisation / Legal

05

A legal firm’s files moved from an ageing server to Teams

We moved 1.8 TB of matter files to Microsoft Teams and SharePoint, connected document scanning to client folders and retired the office server — with modern device management and faster internet.

1.8 TB
of matter files migrated to Teams and SharePoint
0
office servers remaining
500/500
Mbps symmetrical Enterprise Ethernet
16
Meraki cameras across the office and carpark
A fresh IT environment for a 200-user drone data company

Cloud migration & fitout / Media & entertainment

07

A fresh IT environment for a 200-user drone data company

After demerging from its parent company, a drone data business needed independent IT. We delivered Microsoft 365, managed devices, a new network and access to over 800 TB of project data.

200
users and machines migrated
800 TB+
project data in Wasabi S3 via Lucid Link
10 Gbps
internet and core aggregation switching
8
Ubiquiti access points across two levels
A dedicated wireless link from a manager’s home to the office

Point-to-point wireless / Professional services

08

A dedicated wireless link from a manager’s home to the office

Slow and unstable home NBN made remote work frustrating. We installed a dedicated point-to-point wireless bridge from the office roof to the manager’s home, bypassing the slow connection.

1 Gbps
dedicated office-to-home wireless link
<5 ms
end-to-end delay
99.9%
link uptime since installation
Same day
access to office files and systems
Three home builder offices connected with gigabit air fibre

Air fibre & point-to-point / Construction

09

Three home builder offices connected with gigabit air fibre

Three offices roughly 300 metres apart struggled to share plans and photos. We linked them with dedicated gigabit air fibre, without trenching streets or waiting months for carrier fibre.

1 Gbps
dedicated air fibre between offices
300 m
approximate distance between sites
3
offices connected as one network
99.9%
target uptime with ring topology
Display homes connected to corporate systems with Meraki SD-WAN

Managed links & display homes / Construction

10

Display homes connected to corporate systems with Meraki SD-WAN

A national home builder needed secure corporate access and reliable guest Wi-Fi at every display home. We deployed Cisco Meraki networking over Swoop NBN or 5G, linked back to NEXTDC.

100%
of display homes connected to the data centre
1 Gbps
Swoop fibre at the data centre head-end
<20 ms
delay to corporate apps from display homes
Same day
turn-up possible for new villages
Hyper-V recovery across two NEXTDC data centres

Recovery & off-site copies / Enterprise

11

Hyper-V recovery across two NEXTDC data centres

An enterprise needed a second location for critical workloads. We built a four-host Hyper-V environment with two storage arrays, real-time replication and dedicated dark fibre between NEXTDC facilities.

4
Hyper-V hosts across two data centres
2
SAN arrays with real-time replication
2
Dell switch stacks for redundant networking
Dedicated
dark fibre between NEXTDC sites
A complete IT setup for a medical centre

IT equipment & network setup / Healthcare

12

A complete IT setup for a medical centre

We set up a medical centre with 20 computers and network ports, a WatchGuard firewall, two Ubiquiti access points, guest Wi-Fi and a 1 Gbps NBN FTTP internet connection.

20
computers set up
1
WatchGuard firewall
2
Ubiquiti access points
1 Gbps
NBN FTTP internet connection
Two offices, one team: London and Perth connected

Multi-site IT setup / Manufacturing

13

Two offices, one team: London and Perth connected

We set up and connected a manufacturing company's head office in London and site office in Perth — firewalls, site-to-site VPN, wireless, switching, a 3CX phone system for free calls between offices, Teams and SharePoint, server backup, 1 Gbps internet at both sites — and a managed IT support plan that looks after the people at both offices.

100
users in the London head office
55
users in the Perth office
2
WatchGuard firewalls with site-to-site VPN
1 Gbps
internet at both offices
155
staff working in the same systems
Full infrastructure replacement for a busy CAD office

Infrastructure replacement / Engineering & design

14

Full infrastructure replacement for a busy CAD office

We replaced an ageing office infrastructure end to end: two new Hyper-V hosts and a Dell SAN in a cluster, a WatchGuard firewall cluster, 10 Gbit networking between every device, dark fibre to the office, and 120 Dell CAD workstations plus 20 admin laptops — with Office 365 for email and Teams, and data staying on-premises.

2
Hyper-V hosts in a cluster
10 Gbit
networking between devices
120
Dell CAD workstations
20
laptops for admin staff
1 Gbit
internet over dark fibre
400 users moved from an ageing office PABX to Teams calling

Teams calling & unified communications / Professional services

15

400 users moved from an ageing office PABX to Teams calling

A 400-seat organisation was stuck on an ageing on-premises PABX with no app and no cloud hosting — during COVID someone had to stay in the office just to answer the phones. We migrated all 400 users to Microsoft Teams calling, so calls now follow each person anywhere.

400
users migrated to Teams calling
1
ageing PABX retired
0
handsets tied to the office network
100%
of staff reachable anywhere

What could we do for your business?

Tell us what needs to work better. We’ll help you find a way forward.

1300 904 635Get in touch