
Industrial Estate Connected with P2P Wireless and Bonded SHDSL Before NBN
Before NBN and Starlink existed, a customer moving into a brand new industrial estate had no copper, no ADSL and no fibre. The incumbent telco quoted $400,000 to install fibre. Instead, we built a point-to-point wireless link to a friendly neighbouring building and bonded two SHDSL connections to deliver 40 Mbps symmetrical for $500 per month. The wireless link is still in place today, upgraded to air fibre, while the SHDSL lines have been replaced with a 1 Gbps FTTP NBN connection.
Key outcomes
- Avoided fibre build cost$400k
- Initial symmetrical speed40 Mbps
- Monthly SHDSL cost$500
