Unicorn IT Group Built Private P2P Wireless Network in a Closed Mining Town illustration
Private wireless ISPMining & Resources

Built Private P2P Wireless Network in a Closed Mining Town

A closed mining town had no usable telco infrastructure and overloaded 5G, leaving 200 homes and small businesses without reliable internet. We designed and built a private point-to-point wireless network from a hilltop POP to every property.

Key outcomes

  • homes and businesses connected200+
  • minimum speed to the POP per property500Mbps
  • segregated internet breakouts at the tower2x 1Gbps
Unicorn IT Group 6-Hop Solar Microwave Network Delivers 100 Mbps Fibre to Remote Mine Site illustration
Wireless backhaulMining & Resources

6-Hop Solar Microwave Network Delivers 100 Mbps Fibre to Remote Mine Site

Before Starlink existed, a remote Western Australian mine site was stuck on a 2 Mbps/2 Mbps satellite link. We designed and built a six-hop solar-powered microwave network to a Tom Price business with a 100 Mbps fibre connection, connecting the mine to its head office for the first time at real broadband speeds. The big-T telco wanted $4.6 million to run fibre; our solution was built for $69,000 excluding the existing Tom Price connection supplied by the mining company.

Key outcomes

  • Bandwidth delivered100 Mbps
  • Cost vs telco quote98% saved
  • Microwave hops6
Unicorn IT Group 30 km Haul Road CCTV and Fibre Network for a Mine Site illustration
Haul-road CCTV & fibreMining & Resources

30 km Haul Road CCTV and Fibre Network for a Mine Site

A mining company had no visibility along its 30 km haul road, so operations could not confirm road conditions, traffic or safety incidents in real time. As part of a broader communications upgrade running fibre from the wharf to the mine and camp, we partnered with a fibre installer to extend fibre the full length of the haul road and build 35 solar-powered CCTV towers. Every tower switch was connected directly back to the fibre backbone — no wireless backhaul was used because the terrain was too hilly, and the fibre was being installed anyway.

Key outcomes

  • Haul road length30 km
  • Solar CCTV towers35
  • Fibre terminations90+
Unicorn IT Group Mining Company Migrated 1200 Users from Exchange 2013 to Office 365 illustration
Enterprise email migrationMining & Resources

Mining Company Migrated 1200 Users from Exchange 2013 to Office 365

A mining company was running 1200 users across 15 on-premise Exchange 2013 servers at its head office and mine sites, with no mobile email, no multi-factor authentication and servers that had long passed end of support. We migrated all 1200 mailboxes to Office 365 in two months, wave by wave, with no email downtime and no impact on 24/7 mine operations.

Key outcomes

  • users migrated from Exchange 2013 to Office 3651200
  • month migration completed across all sites2
  • email downtime during the migration0